Our powder coat system consists of the following:
780 feet of mono rail
3-stage washer system:
a) Stage 1- Cleaner/Phosphate
b) Stage 2- Rinse
c) Stage 3- Final Seal/ Reverse Osmosis
10 minute dry off stage
Environmental room:
a) Humidification/ Dehumidification
b) HVAC
Nordson Excel powder booth couple with a Versa-Coat Batch
Booth:
a) I-Control integrated Control System
b) 12-Versa-Spray guns, (Automatic Powder Guns)
c) Reclaim Color Module
d) Versa-Coat Spray to waste
40 minute Cure oven
Cooling Tunnel
40 minute Cure oven
|